Blue Flower

The following material presents the ability to execute multiple projects within the framework of a program that aims to plan, control, and produce a new technology product, including hardware components, software, and many modern popular technologies. Project management students can use this material as an additional educational training resource for their BVOP project management certification examination or implement it into a real project professional environment.

Each project is described with a separate section and its sequence, dependencies and project team are indicated.

  • Project analysis and product requirements 
  • A project to create the vision and design of the product
  • Project for the technical phase of product creation 
  • A project for creating and configuring hardware components
  • Machine parts manufacturing project
  • A project to assemble parts and create a prototype 
  • Operating System Integration Project 
  • Project for the development of unique software tools 
  • General Laundry Testing Project 
  • Project for eventual processing 
  • Product Approval Project
  • Spare Parts Creation Project.
  • Project analysis and product requirements

The material is approved by a project management supervisor assigned by PM.MBA - Masters Project Management

Defining and meeting the legal requirements for the product and basic safety expectations in general. Analyzing markets and consumers. Analyzing the risk of the product in operation, determining the time range for creating and operating the product, setting the budget, including already defined product features, identifying other important resources.

Requirements are analyzed during meetings and interviews with clients' managers and specialists, and the duration of this step may vary from several days to several weeks, depending on the complexity of the tasks and the scale of execution.

Defining and describing the requirements (methodological and technical) are the steps that largely determine the success of the whole project, as they affect all other stages. Practice shows that underdevelopment of requirements is often manifested only when the project is almost completed and a considerable part of the funds allocated for its implementation has already been spent. Unfortunately, debugging at the design stage is much more expensive than careful analysis at the analysis stage.

A project to create the vision and design of the product

A team of 2D and 3D designers who create the model in full detail. It starts before the rest of the projects, however, after detailed and validated product requirements.
It can be done by an outside company as the work should be one-off and we do not need the support of the designers in the future.

Project technical phase of product creation

Create accurate and clear specifications that are sent to hardware startups.
The project can only start after the completion of the second project

A project to assemble parts and create a prototype

Once we have all the parts manufactured, a prototype is assembled.
A prototype is needed as the virtual model of the device goes into the physical world and becomes real and tangible.
However, this transition necessarily creates problems that cannot be identified in the design phase. But they must be identified before the process of preparing the product for mass production begins.
The project can only start after the completion of Project 3.
It can be performed by our technical teams or outsourced

A project to integrate an operating system into a washing machine

Includes:

Choosing the right operating system for the product. Recommended latest model popular operating system

Integration of the operating system into the product
 
Programming drivers as needed.
 
Testing all drivers and successfully integrating the operating system with the product hardware.

The project can only be completed after the completion of Project 4
It is executed by our in-house teams of developers specializing in low-level programming.

A project to create unique software tools

It includes the development of our software that is embedded in the operating system (graphical interface, the ability to install additional applications from the App Store, the ability to manage remotely - for additional extras we need to provide servers or use cloud technologies)

Basic functional units of the washing machine can define which will give us a clear idea of ​​all the interconnections inside and outside the product.

Run by another team of developers.

The project is being implemented in parallel and simultaneously with Project 5 to save time, which would be wasted if the same team of programmers was to develop this project who had programmed the drivers from Project 5.

Project - General Product Testing

Why include testers, analysts, and other participants?

Because in the general testing of a product, many defects are usually found that are corrected before they reach production. In a broader sense, testing is one of the quality control techniques that include Test Management, Test Design, Test Execution, and Test Analysis.

It is performed by testers and analyzers. If there are no such specialists in a company, it can be given to test an outside company. It can be executed after a product prototype is ready with all systems embedded.

Project for eventual processing of errors detected during testing and control

Reconstruction includes all subsequent efforts such as dismantling, repair, replacement, reassembly, etc.

When processing is required, the manufacturer/supplier receives a document outlining instructions for performing the task. This will include sorting, processing, etc. The document will list the tools needed for the processing and the process - with photos showing what to look for in the affected parts. After re-testing, re-testing is performed. This cycle is repeated until errors are detected and the product is approved.

Product approval

When our product goes through a successful testing phase, an analysis must be made. The analysis must be impartial and competent and meet the general requirements in accordance with ISO / IEC 17025 or be accredited by an analysis laboratory. Then a license must be issued.

Spare part creation project

Spare parts must be guaranteed for a period of ten years after the product has been discontinued.
At the planning stage, production of the spare parts should be foreseen and in accordance with the estimated capacity, they should be worked out together with the main parts.